
Green Demolition Bylaw teardowns, LEED diversion targets, salvage-first strip-outs — our crew disassembles, sorts, and documents so your permit compliance and waste reporting are handled. Our bins, our trucks, one invoice.
If you're pulling a demo permit on a pre-1950 home in Vancouver, you already know the Green Demolition Bylaw math: hit the salvage and recycling minimums or eat the compliance deposit. Deconstruction done by a crew that treats it like regular demo — smash, load, dump — leaves you short on diversion and long on paperwork problems.
We run deconstruction salvage-first: soft strip, sorted disassembly, source-separated bins on our own fleet, and weigh tickets from certified recycling facilities. You get the diversion documentation your permit file or LEED submittal needs — compiled by us, not chased down by your PM after the fact.

Every load is sorted, weighed, and documented so your diversion numbers hold up at permit close-out.
Salvage-first sequencing with documentation at every step — one crew, one invoice.
We walk the structure with you or your super, identify salvage value and diversion targets, flag hazmat survey requirements, and quote the job all-in — labour, bins, hauling, and reporting.
Fixtures, doors, flooring, and reusable materials come out first — set aside for retention, donation, or resale, with receipts documented for your file.
The structure comes apart in sequence, not in a heap. Wood, metal, and concrete go into source-separated bins on our own fleet as we work.
Loads go to certified facilities, weigh tickets come back to us, and you get a compiled diversion package ready for permit close-out or LEED submittal.
Pre-1950 Vancouver homes with salvage and recycling minimums attached to the demo permit — we hit the numbers and hand you the paperwork.
Construction waste management credits need documented diversion. Our weigh-ticket packages slot straight into your LEED submittal.
Heritage retention projects where old-growth framing, trim, and features carry real value — salvaged carefully, not landfilled.
TI and office deconstruction where the client or municipality requires waste diversion reporting alongside the usual schedule pressure.
Yes. For pre-1950 homes under Vancouver's Green Demolition Bylaw, we plan the deconstruction around the salvage and recycling minimums tied to your demo permit, run source-separated bins, and compile the weigh tickets and diversion documentation you need for permit close-out and deposit recovery.
Our crew mobilizes throughout the Lower Mainland and Fraser Valley with same-week availability.
Send us the scope or book a site walk. You'll get an all-in quote covering labour, sorted bins, hauling, and the diversion paperwork your permit file needs. COIs and WorkSafeBC clearance available for your site file.
Need precision demo without the salvage scope? See our selective demolition service or all our Vancouver demolition services.