
Wood deck removal, composite deck teardowns, railing and stair demolition, pergola takedowns, and concrete footing removal for homeowners and contractors across Vancouver, Burnaby, Surrey, and the Lower Mainland.
From deck boards to footings, we handle the full demolition so your yard is clean and ready for whatever comes next.
Cedar, pressure-treated, and natural wood deck boards, joists, beams, and ledger boards removed. We pull nails and screws, dismantle section by section, and load into our bins.
Deck railings, staircases, support posts, and brackets torn down. Metal, wood, and glass railing systems all handled.
Pergolas, gazebos, arbors, and overhead shade structures dismantled and hauled. We handle both wood and metal frame structures.
Concrete pier footings, sonotubes, and deck pad foundations broken up and removed. We backfill holes and grade the area clean when requested.
Decks are attached to your home. A careless teardown damages siding, flashing, fascia, and the foundation wall where the ledger board connects. Our crew detaches the deck from the house cleanly, protects siding and landscaping, and removes everything — boards, framing, and footings — without leaving a mess in your yard.
Whether it is a small backyard deck, a large multi-level structure, or a rooftop patio — we bring the crew, tools, and bins to get it done in a day.

We walk the deck, check how it is attached to the house, assess footing depth, and quote one all-in price — teardown, bins, hauling, and site cleanup.
Siding and landscaping are protected. The deck is disconnected from the house at the ledger. Utilities running through or under the deck are identified and safeguarded.
Boards come off, framing comes down, posts get pulled, and footings get broken. Everything goes into our bins on-site. Most decks are down in a single day.
All deck debris leaves on our trucks. The site is raked clean, nails and hardware are picked up, and footing holes are backfilled if requested.
Get a free, all-in deck demolition quote — teardown, footings, bins, hauling, and site cleanup included.
Cedar, pressure-treated, and natural wood decks dismantled and hauled. The most common deck demolition in Vancouver — from small backyard decks to large wraparound structures.
Trex, TimberTech, and other composite decking removed along with the underlying framing. Composite material is heavier and requires different cutting techniques.
Two-story decks, split-level structures, and elevated platforms with stairs, railings, and multiple support post systems. We dismantle top-down for safe, controlled removal.
Concrete patios, paver patios, pergolas, gazebos, and covered outdoor structures torn down and hauled. Site graded and raked clean.
Deck demolition in Vancouver typically costs between $1,500 and $5,000, depending on size, height, material, and whether footings need to be removed. That price covers labour, bins, hauling, and site cleanup.
Small ground-level decks cost less; large multi-level or elevated decks cost more. Footing removal adds to the price. Request a free quote for accurate pricing.
Most residential decks are torn down and hauled in a single day. Small ground-level decks take half a day; large multi-level decks or decks with deep footings may take two days.
Our deck demolition crew mobilizes throughout the Lower Mainland with same-week availability.
Wood, chain-link & metal fence teardown and post removal.
Learn MoreSlabs, walkways, patios & foundations broken and hauled.
Learn MoreFull garage teardowns — structure, slab & foundation removed.
Learn MorePrecision demo — remove what goes, protect what stays.
Learn MoreSend us your deck demolition scope or book a free site visit. All-in quote, same-week mobilization, bins on the truck.