
Full basement gut-outs, framing removal, drywall strip-outs, ceiling teardowns, flooring removal, and old fixture disposal for contractors and homeowners across Vancouver, Burnaby, Surrey, and the Lower Mainland.
From framing to flooring, we handle the full basement demolition scope so your contractor walks into a clean, open workspace.
Interior framing, partition walls, non-load-bearing walls, and bulkheads removed. We identify and protect load-bearing elements before any demo begins.
Wall drywall, ceiling drywall, drop ceilings, T-bar grid, and insulation stripped down to joists and studs. Moisture-damaged and mold-affected materials bagged separately.
Carpet, tile, laminate, vinyl, and subfloor removal. We handle adhesive scraping and thin-set grinding to leave a clean concrete slab.
Old bathroom fixtures, kitchenette cabinets, built-in shelving, electrical panels (coordinated with electrician), and outdated finishes removed and hauled.
Basements present unique challenges: low ceilings, tight stairways, load-bearing columns, concealed utilities, and potential moisture or mold issues. Our crew walks the space before demo day, identifies structural elements, flags potential hazards, and scopes everything in a single all-in quote.
Whether it is a full basement gut-out for a legal suite conversion, a partial demo for a rec room renovation, or clearing an old basement suite — we handle demo, bins, hauling, and broom-clean handoff.

One crew, one invoice — most Vancouver basement demolitions completed in 1-2 days.
We walk the basement, confirm scope, identify load-bearing elements and utilities, and quote one all-in price covering demo, bins, hauling, and cleanup.
Stairways get protected, dust barriers go up at the basement entry, and mechanical areas are masked. Utilities are shut off and capped where needed.
Framing comes down, drywall gets stripped, ceilings get pulled, and flooring comes up — all loaded into our bins. Most basement demos take 1-2 days.
All basement debris leaves on our trucks. The space is swept, vacuumed, and ready for your next trade — framer, electrician, or plumber.
Get a free, all-in basement demolition quote — demo, bins, hauling, and broom-clean handoff included.
Everything goes — framing, drywall, ceilings, flooring, insulation, and old fixtures. Down to bare concrete and joists, ready for a complete rebuild.
Remove an old illegal suite or outdated legal suite — kitchenette, bathroom, partition walls, and all finishes — to start a new suite build to current code.
Selective removal of specific areas — just the rec room, just the old bathroom, or just the ceiling and framing in one section. Keep what works, remove what doesn't.
Office basement strip-outs, retail lower-level demolition, and commercial space clearing. After-hours scheduling available for occupied buildings.
A full basement gut-out in Vancouver typically costs between $2,500 and $8,000 all-in, depending on square footage, scope, and complexity. That covers labour, bins, hauling, disposal, and broom-clean handoff.
Partial basement demos — a single room or just the ceiling and drywall — cost less. Basement suite removals with kitchenette and bathroom tend toward the higher end due to plumbing disconnects and fixture disposal.
The fastest way to get an accurate price is to request a free quote or schedule a walkthrough.
Most residential basement gut-outs take 1-2 days depending on size and scope. A small rec room strip-out may take a single day; a full 1,000+ sq ft basement with bathroom and kitchenette typically takes two days.
Our basement demolition crew mobilizes throughout the Lower Mainland with same-week availability.
Full kitchen gut-outs, cabinet removal & countertop teardowns.
Learn MoreTile, tub, vanity & shower removal — down to studs.
Learn MoreStrip, haul & dispose — clean walls ready for re-boarding.
Learn MorePrecision interior demo — remove what goes, protect what stays.
Learn MoreSend us your basement demolition scope or book a free walkthrough. All-in quote, same-week mobilization, bins on the truck.